Business service · Premises

Set up utilities

Power, water, waste and connectivity at the site.

ConditionalExternal serviceNot a government requirement · Last reviewed 2026-08-01

What is this?

Connection and metering of the services your operation depends on.

Why do you need it?

  • Production capacity
  • Occupancy permits
  • Operating cost forecasting

Inzira guidance

Anyone occupying premises, especially manufacturers. During fit-out, before equipment installation.

How to do it

  1. 01Calculate power and water demand.
  2. 02Apply for the connection and metering.
  3. 03Arrange waste and effluent handling.
  4. 04Arrange internet connectivity.
  5. 05Plan backup power if downtime is costly.

What to look for

  • Available capacity at the site
  • Connection lead time
  • Tariff and metering type
  • Backup requirements

Was this step helpful?