Industrial electricity connection
Application for a new or upgraded power connection for an industrial facility.
Direct online application not verified
Application method: Institution portal. Use the official information below and confirm the current process with Rwanda Energy Group.
Does this apply to you?
Inzira guidance
Processing and manufacturing facilities need a confirmed power supply before operating.
Businesses requiring a new or upgraded connection.
What you need
Document checklist
Track each document. Its status carries across every other procedure on your path that needs it.
Site plan and land title or lease
Estimated load requirement
Certificate of incorporation
Where do you apply?
Rwanda Energy Group
Application method: Institution portal
Direct online application not verified
Application method: Institution portal. Use the official information below and confirm the current process with Rwanda Energy Group.
What happens next?
This step feeds into your ongoing operating obligations. Check your journey for the next stage.
Need help?
Typically handled with: Electrical engineer, Project consultant. Practitioners can apply to be listed — free while Inzira is in development.
Electrical engineer
Power connection design, load studies and installation certification.
When you need one: When connecting industrial power or backup generation.
Project consultant
Project management across design, procurement and commissioning.
When you need one: For multi-contractor build and equipment projects.